Overview
(The actual product is subject to the customer's product)
Process flow
1 The equipment is placed on the double-speed line, after the product flow is in
place.
2 The welding head is fixed on the robot and controls the robot to weld the battery pack.
3 After welding, it flows to the lower station aluminum row installation position.
Configuration list
S/N | Item | Brand | Quantity | Unit |
1 | Position device | SHINHOP | 1 | Pcs |
2 | ABB robot | ABB | 1 | Pcs |
3 | 3000W laser source | Raycus | 1 | Pcs |
4 | Safety house | SHINHOP | 1 | Pcs |
5 | Electrical device | Chint/ Schneider | 1 | Pcs |
6 | Computer display/Host | EVOC/Dell | 1 | Pcs |